Air Vehicle Integration and Technology Research (AVIATR). Task Order 0003: Condition-Based Maintenance Plus Structural Integrity (CBM+SI) Demonstration (April 2011 to August 2011)

Abstract

This report summarizes progress made on the AVIATR contract Task Order 3, Condition Based Maintenance plus Structural Integrity-Option Phase during the reporting period April 2011 through August 2011. Similar to previous progress reports on this project, the report follows the process detailed in the CBM+SI flowchart. A detailed general purpose flow chart is presented initially, which is followed by a discussion on the specific application for the process on the F-15 wing demonstration. The remaining sections discuss topics within the flowchart that have been tasked during the reporting period. In this progress report tasks related to in-situ sensor system capability analysis, updates to the component level risk analysis and cost benefit analysis are discussed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 2011
Accession Number
ADA586666

Entities

People

  • Keith Halbert
  • Leroy Fitzwater
  • Y. T. Torng

Organizations

  • Boeing

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Sensors
  • Space

DTIC Thesaurus Topics

  • Air Force
  • Air Force Research Laboratories
  • Aircrafts
  • Basic Programming Language
  • Cold Working
  • Condition Based Maintenance
  • Contracts
  • Cost Benefit Analysis
  • Costs
  • Detection
  • Maintenance
  • Random Variables
  • Risk
  • Risk Analysis
  • Spreadsheet Software
  • Structural Health Monitoring
  • Structural Integrity

Readers

  • Aerospace Engineering
  • Technical Research and Report Writing.