Case History of Breakwater/Jetty Repair: Chemical Grout Sealing of Palm Beach Harbor South Jetty, Florida
Abstract
To describe the most recent Corps of Engineers experience in sealing void in a permeable jetty (Palm Beach Harbor South Jetty, Florida), and to discuss the implications of this on-the-job learning process in the absence of definitive design guidance at present for the placement of chemical grouts under wave conditions.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1987
- Accession Number
- ADA591702
Entities
Organizations
- Coastal Engineering Research Center