Air Vehicle Integration and Technology Research (AVIATR). Task Order 0003: Condition-Based Maintenance Plus Structural Integrity (CBM+SI) Demonstration (September 2012 to March 2013)
Abstract
This report summarizes progress made on the AVIATR contract, Task Order 0003, Condition-Based Maintenance Plus Structural Integrity -- Option Phase during the reporting period September 2012 through March 2013. The updated CBM+SI process flowchart is presented, which represents an overview of the work being performed on this project. The remaining sections discuss topics within the flowchart that have been tasked during the reporting period.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 2013
- Accession Number
- ADA591927
Entities
People
- Herb Smith
- Keith Halbert
- Leroy Fitzwater
- Paul Kesler
- Scott Greene
- Tony Torng
Organizations
- Boeing