Can the Modular Engineer Battalion Headquarters Be Multifunctional?

Abstract

The 5th Engineer Battalion received its deployment order for Operation Iraqi Freedom late in 2007 and deployed the following year. The battalion had recently transformed to the new modular structure, and its three mechanized companies became one sapper company and two mobility augmentation companies (MACs). Its projected mission in Iraq was route clearance, rapid crater repair, route sanitation, and culvert denial, so the battalion trained hard for those tasks. That training included a mission readiness exercise at the National Training Center, Fort Irwin, California. However, soon after deploying to Iraq, the battalion was involved in multiple construction projects across the areas of operation of two brigade combat teams (BCTs). Regardless of the type of engineer battalion or the missions its leaders expected to have, those BCTs needed immediate construction and technical support.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 2009
Accession Number
ADA592591

Entities

People

  • William C. Hannan

Organizations

  • United States Army Engineer School

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Civil Engineering
  • Command And Control
  • Construction
  • Deployment
  • Engineering
  • Engineers
  • Force Protection
  • Global Positioning Systems
  • Iraqi-War
  • Job Training
  • Modular Construction
  • Personnel Management
  • Project Management
  • Training
  • United States
  • Warfare

Readers

  • Maritime Combat Support and Expeditionary Logistics.
  • Military Science
  • Military and Counterinsurgency Studies.