ESPC Operational Implementation and Validation
Abstract
The long-term goal is a fully coupled global atmosphere/ocean/ice/wave/land prediction system providing daily predictions out to 10 days and weekly predictions out to 30 days. Task: Design the infrastructure for operational implementation of the coupled system. The main objective of this task is designing the infrastructure for operational implementation of the fully coupled global system. This design includes scoping the system to fit within the constraints of the operational centers. These constraints include both computational and manpower resources. Determination of the run cycle will take into account the three main forecasts (10 day deterministic, 30 day deterministic and 30 day probabilistic) with data assimilation for the different components to be considered. Data streams, inputs and post-processing also will be considered.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 2013
- Accession Number
- ADA601270
Entities
People
- Edward Joseph Metzger
Organizations
- United States Naval Research Laboratory