AGOR 28

Abstract

1. Meetings: i. Participated in weekly conference calls. ii. Participated in weekly yard meeting with yard and GPA iii. Travel to Alpharetta, GA for MCS FAT at Siemens 2. The following Shipyard Question Submittals were reviewed and commented on: Q94- Washer Dryer Specification Waiver DCI is requesting comment on the washer and dryer ordered for the AGOR 27 vessel. Is the set in question acceptable, as they are rated non-commercial? Government is insisting on commercial grade washers and dryers. 3. Logistics: i. Continuing to review Vendor Recommended Spares (VRS). ii. Continuing to review Technical Manuals and Supplemental Information. iii. Continuing to work on initial outfitting lists for Sally Ride. 4. Other Work Items: Sally Ride Progress - There continues to be no notable progress in the pipe, hvac or electrical work on Ride.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 09, 2014
Accession Number
ADA601946

Entities

People

  • Paul D. Bueren

Organizations

  • Scripps Institution of Oceanography

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Bearing Races
  • Bearings
  • Bilge Keels
  • Check Valves
  • Contracts
  • Fuel Oils
  • Governments
  • Information Operations
  • Instructions
  • Instructors
  • Lead Acid Batteries
  • Logistics
  • Maintenance
  • Measurement
  • Military Research
  • Shipyards

Readers

  • Government Contracting/Procurement.
  • Naval Architecture and Marine Engineering.
  • Software Engineering