AGOR 27/28 Phase 2
Abstract
1. This report covers SIO activities during the month of April 2014. 2. Shipyard Representative biweekly reports and this report were delivered on schedule. 3. The work accomplished included Scripps technical review of questions posed by NAVSEA and PEO Ships concerning Dakota Creek Industries (DCI) inquiries on the specifics of OCEAN AGOR design. The shipyard representative report, submitted separately, details specific DCI required submissions and drawings reviewed against technical standards. SIO continues to review technical manuals and attend factory acceptance tests.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 2014
- Accession Number
- ADA604119
Entities
People
- S. Z. Kelety