MetalMapper System: Camp San Luis Obispo Discrimination Study
Abstract
Data collection with the MetalMapper system in support of 2009 ESTCP Discrimination Study, San Luis Obispo, CA commenced on 25 May and continued until 16 June. Allowing for the 4-day break we took from 4-7 June, the data collection required 19 field days. All operations were conducted in accordance with the draft demonstration plan that we submitted prior to mobilizing to San Luis Obispo (SLO) [1]. Table 1 contains a log of daily activities. Based on that table, approximately 12 field days were required for the dynamic (detection mapping) part of the demonstration while 7 days were spent in performing the static ( Cued ID ) survey.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 2009
- Accession Number
- ADA606689
Entities
People
- Mark Prouty