Final Environmental Assessment Addressing Building Demolition at Kirtland Air Force Base, New Mexico
Abstract
The 377 ABW proposes to demolish 20 buildings on Kirtland AFB to make space available for future construction, to help comply with USAF direction to reduce Kirtland AFB's physical presence by 20 percent by 2020, and to fulfill its mission as installation host through better site utilization. None of the buildings proposed for demolition are currently occupied or used by installation personnel. The analysis in this EA addresses the Proposed Action, the No Action Alternative, and alternatives considered but eliminated from detailed analysis.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 2010
- Accession Number
- ADA611055
Entities
People
- Alvin Banguilan
- Elaine Dubin
- Louise Baxter
- Melissa L Clark
- Paul D'ornellas
- Shannon Cauley
- Stuart Gottlieb
- Sylvia Fontes
- Timothy Didlake
- Tom Blonkowski
Organizations
- HDR, Inc.