Final Environmental Assessment Eglin Readiness Center Improvements Project Eglin Air Force Base, Florida, RCS 02-450 & -451
Abstract
This EA has been prepared in accordance with the National Environmental Policy Act to analyze the potential environmental consequences from the proposed expansion of the paved marshalling yard and installation of an aircraft cargo loader shelter at the ERC, Eglin AFB. The document includes analysis of land use and aesthetics, geology and soils, water resources, air quality, and biological resources. The Proposed Action consists of extending the existing paved marshalling yard at the ERC approximately 100 feet to the northeast and installation of the shelter between Buildings 1392 and 1400. The Alternative to the Proposed Action includes a 270- square-foot extension of the paved marshalling yard to the northwest and installation of the shelter between Buildings 1392 and 1400. The No-Action Alternative, which would entail no ERC improvements, was also evaluated. No significant adverse environmental impacts are expected from the proposed ERC improvements project.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 2004
- Accession Number
- ADA611177
Entities
People
- C. M. Brown
- Carl Rykaczewski
- Derrick Coleman
- Ken Forman
- Maria Langmaack
- Wen Huang
Organizations
- Air Armament Center