Final Environmental Assessment Eglin Readiness Center Improvements Project Eglin Air Force Base, Florida, RCS 02-450 & -451

Abstract

This EA has been prepared in accordance with the National Environmental Policy Act to analyze the potential environmental consequences from the proposed expansion of the paved marshalling yard and installation of an aircraft cargo loader shelter at the ERC, Eglin AFB. The document includes analysis of land use and aesthetics, geology and soils, water resources, air quality, and biological resources. The Proposed Action consists of extending the existing paved marshalling yard at the ERC approximately 100 feet to the northeast and installation of the shelter between Buildings 1392 and 1400. The Alternative to the Proposed Action includes a 270- square-foot extension of the paved marshalling yard to the northwest and installation of the shelter between Buildings 1392 and 1400. The No-Action Alternative, which would entail no ERC improvements, was also evaluated. No significant adverse environmental impacts are expected from the proposed ERC improvements project.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 2004
Accession Number
ADA611177

Entities

People

  • C. M. Brown
  • Carl Rykaczewski
  • Derrick Coleman
  • Ken Forman
  • Maria Langmaack
  • Wen Huang

Organizations

  • Air Armament Center

Tags

Communities of Interest

  • Air Platforms
  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Birds
  • Environment
  • Environmental Protection
  • Environmental Restoration And Remediation
  • Fish
  • Fungi
  • Groundwater
  • Habitats
  • Medical Personnel
  • Natural Resources
  • Water Resources
  • Wildlife

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Logistics and Supply Chain Management.