AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report

Abstract

Progress on the building of AGOR 28, oceanographic research vessel Sally Ride. Work continues 1) reviewing Vendor Recommended Spares (VRS); 2) reviewing Technical Manuals and Supplemental Information; 3) work on initial outfitting lists for Sally Ride; and working on NS5 Hierarchy.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 09, 2014
Accession Number
ADA611200

Entities

People

  • Paul D. Bueren

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Acceptance Tests
  • Acoustic Insulation
  • Ball Valves
  • Check Valves
  • Control Panels
  • Fuel Pumps
  • Information Operations
  • Junction Boxes
  • Materials
  • Pressure Regulators
  • Regulators
  • Relief Valves
  • Shipyards
  • Statistics
  • Test And Evaluation
  • Valves

Readers

  • Naval Architecture and Marine Engineering.