Final Environmental Assessment: Central Issue Facility at Joint Base McGuire-Dix-Lakehurst, New Jersey

Abstract

PURPOSE. Finding of No Significant Impact (FONSI) Environmental Assessment (EA) Central Issue Facility at Joint Base McGuire-Oix-Lakehurst (JB MDL) New Jersey MI~V 2013 The purpose of the Proposed Action is to provide a modern warehouse facility specifically designed for central issue operations required to support multi-service uniform requirements. The U.S. Army on JB MDL has prepared this EA lAW the National Environmental Policy Act (NEPA); Council on Environmental Quality (CEQ) regulations implementing NEPA: and Title 32. Code of Federal Regulations, Part 989, as amended, "Environmental Impact Analysis Process" (EIAP). Description of the Proposed Action The Proposed Action is to construct a medium-sized USAGE Standard Design central issue facility for operations required to support multi-service uniform requirements in the Dix cantonment area within the boundaries of JB MpL. The facility is required for the receipt, stock, issue, exchange, and turn-in of designated Organizational Clothing and Individual Equipment (OCIE} items to soldiers.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 2013
Accession Number
ADA611306

Entities

People

  • Dorothy Peterson
  • Stacey Schueler

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Birds
  • Chemistry
  • Civil Engineering
  • Construction
  • Dielectric Gases
  • Environment
  • Environmental Protection
  • Environmental Restoration And Remediation
  • Geography
  • Habitats
  • Health Services
  • Management Personnel
  • Materials Testing
  • Medical Personnel
  • Occupational Safety And Health
  • Recreation
  • United States

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Logistics and Supply Chain Management.