AGOR 28, SIO Shipyard Representative Bi-Weekly Progress Report

Abstract

Progress on the building of AGOR 28, oceanographic research vessel Sally Ride. Work continues 1) reviewing Vendor Recommended Spares (VRS); 2) reviewing Technical Manuals and Supplemental Information; 3) work on initial outfitting lists for Sally Ride; and working on NS5 Hierarchy. Intermediate Shaft Bearings have been installed on Ride s modified foundations. Alignment in progress on both vessels. Unresolved issues with fairlead interferences from TK70-70 main crane remain. DCI is using Sally Ride's aft fairlead foundation to test various new locations on Armstrong.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 04, 2014
Accession Number
ADA615086

Entities

People

  • Paul D. Bueren

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Bearings
  • Classification
  • Contractors
  • Contracts
  • Cooling
  • Cooling And Ventilating Equipment
  • Doors
  • Fresh Water
  • Heavy Duty
  • Hierarchies
  • Information Operations
  • Military Research
  • Piping Systems
  • Shipyards
  • Water Cooling
  • Watertight Doors

Readers

  • Naval Architecture and Marine Engineering.