AGOR 27/28 Phase 2

Abstract

The work accomplished included Scripps technical review of questions posed by NAVSEA and PEO Ships concerning Dakota Creek Industries (DCI) inquiries on the specifics of OCEAN AGOR design. The shipyard representative report, submitted separately, details specific DCI required submissions, ship checks and drawings reviewed against technical standards. SIO continues to review technical manuals and attend factory acceptance tests.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 2014
Accession Number
ADA615340

Entities

People

  • S. Z. Kelety

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Acceptance Tests
  • Availability
  • Classification
  • Construction
  • Contracts
  • Information Operations
  • Instructions
  • Lubricants
  • Monitoring
  • Production
  • Shipyards
  • Standards
  • Technical Standards

Readers

  • Naval Architecture and Marine Engineering.
  • Systems Analysis and Design
  • Technical Research and Report Writing.