Final Environmental Impact Statement for Proposed Barry M. Goldwater Range East Range Enhancements (Including First and Second Record of Decision)

Abstract

This Record of Decision (ROD) docwnents the decisions of the U.S. Air Force regarding 6 of 10 proposed enhancements to the eastern portion of the Barry M. Goldwater Range (BMGR), also known as BMGR East. The 10 proposals include: (1) developing a sensor training area, (2) establishing efficient and timely enviromnental review and approval procedures to address recon.figuration of existing air-to-ground target complexes on the tactical ranges, (3) installing a moving-vehicle target system to support air-to-ground attack training, ( 4) developing a new target to support training in live air-to-ground missile employment within the East tactical range (East TAC), (5) lowering the regular flight altitude floor over a portion of the Cabeza Prieta National Wildlife Refuge, (6) converting a portion of Manned Range 3 into a helicopter gunnery range, (7) allowing additional training in combat search and rescue and similar ground-based and combined air-ground operations, (8) constructing a new taxiway and air traffic control tower at Gila Bend Air Force Auxiliary Field (AF AF), (9) paving approximately 7 miles of an existing graded road within the BMGR East, and (1 0) excavating, stockpiling, and using sand and gravel resources on the BMGR East. The Air Force has reached a decision regarding six of these proposals.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 2010
Accession Number
ADA624761

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Ground and Sea Platforms
  • Human Systems
  • Sensors
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Climate Change
  • Eutrophication
  • Habitats
  • Health Services
  • Medical Personnel
  • Poultry
  • Wildlife

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.