Shoaling Analysis at Brazos Island, Harbor Inlet, Texas
Abstract
This Coastal and Hydraulics Engineering Technical Note (CHETN) describes channel shoaling analysis performed at Brazos Island Harbor (BIH) Inlet, TX. The BIH entrance channel has experienced increased frequency of shoaling in recent years that has resulted in draft restrictions. The cause of the increased shoaling is being investigated by the Brazos Island Harbor Channel Shoaling Project as part of the U.S. Army Corps of Engineers (USACE) Monitoring Completed Navigation Projects (MCNP) Program. MCNP is one of the USACE Navigation research programs. The analysis was performed to determine the historical dredging frequency and volume dredged compared to recent events.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 2015
- Accession Number
- ADA624911
Entities
People
- David B. King
- Ernest R. Smith
- Richard Styles
- Tahirih C. Lackey
Organizations
- Engineer Research and Development Center