AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report

Abstract

Progress on the building of AGOR 28, oceanographic research vessel Sally Ride. Work continues on initial outfitting lists for Sally Ride and NS5 Hierarchy. DCI continues with the cleaning and prepping of Ride staterooms for closeouts. In the galley and mess, the exhaust hood wash-down system cabinet has been installed, plumbed and connected to electrical service. Yard will next install the wash-down spray bar and drain hose. Main Lab deck treatment completed. Ceiling panels and lighting are being installed in the Wet Lab. The fire pumps and piping were tested with Coast Guard in attendance. No issues or discrepancies noted. Cummins is on board working on isolating the engine DC circuits from the vessel. Cummins & Siemens have corrected the emergency stop issues. The generator breakers now open immediately on receiving the emergency stop signal. Originally the trip was wired for a delayed shutdown, which caused the breaker to remain closed while the engine shutdown, resulting in a reverse power relay trip. Complete the Kongsberg K-Thrust portion of the Periodic Safety Test Procedure with USCG in attendance. All tests were completed without faults

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 12, 2015
Accession Number
ADA626540

Entities

People

  • Paul D. Bueren

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Battery Chargers
  • Coast Guard
  • Drinking Water
  • Emergencies
  • Engineering
  • Fire Pumps
  • Fuel Oils
  • Information Operations
  • Materials
  • Military Research
  • Refrigeration Systems
  • Sea Water
  • Shipyards
  • Sound Powered Telephones
  • Telephone Systems
  • Test And Evaluation

Readers

  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Environmental Engineering.
  • Naval Engineering and Maritime Security