Environmental Assessment for a Security Forces Armory/Combat Arms Facility

Abstract

The U.S. Air Force (Air Force) Air Mobility Command proposes the construction of a Security Forces Armory/Combat Arms (SFA/CA) Facility at Travis Air Force Base (AFB). The purpose of this Environmental Assessment (EA) is to determine whether the Proposed Action would have a significant adverse effect on the quality of the environment. An EA is the appropriate documentation required according to Air Force Regulations (Title 32 of the Code of Federal Regulations [CFR], Section 989, Environmental Impact Analysis Process). The Proposed Action does not qualify for a Categorical Exclusion and an environmental impact statement is not required because none of the impacts potentially resulting from the Proposed Action would be significant.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 21, 2005
Accession Number
ADA630475

Entities

People

  • Christine Roberts
  • Ed Mccarthy
  • Karin Lilienbecker
  • Kim Basial
  • Mike Urkov
  • Tony Jaegel

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Alkenes
  • Birds
  • Dielectric Gases
  • Environment
  • Environmental Protection
  • Environmental Restoration And Remediation
  • Groundwater
  • Habitats
  • Health Services
  • Hygiene
  • Materials Testing
  • Medical Personnel
  • Waste Disposal Facilities
  • Waste Management
  • Water Resources
  • Wildlife

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.