Final Environmental Assessment for Construction of a Precision Measurement Equipment Laboratory Facility on Eglin Air Force Base, FL
Abstract
The Proposed Action is to construct a 28,330-square-foot PMEL facility, a parking lot, and associated infrastructure to the east of Building 613, located off Eighth Street. The Air Force would construct the facility with a reinforced concrete foundation, split ribbed concrete masonry base, metal ribbed wall panels, steel frame, and standing seam metal roof The facility would include a screen room within calibration/repair, acoustic room, air lock, offices, mechanical room, receiving/storage, bench stock, building support areas, fire sprinkler system and an energy management control and mechanical system that provides critical temperature and humidity control. The proposed site consists of existing impervious surfaces, as well as graveled and grassed areas. The Proponent has not yet decided the exact location of the proposed project within the Proposed Action footprint. The site would also feature a stormwater discharge system (retention pond or a series of swales) to temporarily store stormwater runoff (on-site). The Proponent has not determined the size, type, and location of the stormwater discharge system However, it is likely that the stormwater discharge system would be located adjacent to the Proposed Action site.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 2006
- Accession Number
- ADA630772
Entities
People
- Amy Sands
- Becky Garrison
- Bob Penrose
- Brad Boykin
- Brent Mcbroom
- Catherine Brandenburg
- Henry Mclaurine
- Jamie Mckee
- Janice Fries
Organizations
- Leidos