AGOR 27/28 Phase II

Abstract

The work accomplished included Scripps technical review of proposed configuration changes. The shipyard representative report, submitted separately, details specific ship checks performed against technical standards. SIO participated in Phase III mission system installation during April and May. Report of this activity will be made by separate correspondence from Woody Sutherland. SALLY RIDE remains behind on construction; however, the newly established NAVSEA PEOSHIPS/DCI 29 June 2016 delivery date appears achievable.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 2016
Accession Number
ADA632883

Entities

People

  • S. Z. Kelety

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Availability
  • Buildings And Structures
  • Cavitation
  • Construction
  • Information Operations
  • Leading Edges
  • Model Basins
  • Model Tests
  • Propellers
  • Research Facilities
  • Reynolds Number
  • Shipyards
  • Standards
  • Surface Warfare
  • Technical Standards

Readers

  • Business Analytics
  • Naval Architecture and Marine Engineering.
  • Systems Analysis and Design