AGOR 27/28 Phase II
Abstract
The work accomplished included Scripps technical review of proposed configuration changes. The shipyard representative report, submitted separately, details specific ship checks performed against technical standards. SIO participated in Phase III mission system installation during April and May. Report of this activity will be made by separate correspondence from Woody Sutherland. SALLY RIDE remains behind on construction; however, the newly established NAVSEA PEOSHIPS/DCI 29 June 2016 delivery date appears achievable.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 2016
- Accession Number
- ADA632883