Abbreviated Environmental Assessment for JLSS 03-0024, Construct Mailroom Building at Pittsburgh Air Reserve Station, Pennsylvania
Abstract
The Proposed Action is to construct a new mailroom facility for the 911 Airlift Wing (A W), Pittsburgh International Airport (lAP) Air Reserve Station (ARS) located at the Pittsburgh International Airport (PIA), Coraopolis, P A. Outside mail received from the US Postal Service is received at a central facility located in the base headquarters building and operated by the Information Systems Flight. Force protection objectives and the physical security program at the 911 A W require a separate building for the base mailroom function due to the potential effects of terrorists activities that may occur through the base mail. Under the No Action Alternative, the current mailroom in the headquarters building would continue to be operated and the base would not be able to effectively meet security requirements.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 2003
- Accession Number
- ADA633054