Abbreviated Environmental Assessment for JLSS 03-0024, Construct Mailroom Building at Pittsburgh Air Reserve Station, Pennsylvania

Abstract

The Proposed Action is to construct a new mailroom facility for the 911 Airlift Wing (A W), Pittsburgh International Airport (lAP) Air Reserve Station (ARS) located at the Pittsburgh International Airport (PIA), Coraopolis, P A. Outside mail received from the US Postal Service is received at a central facility located in the base headquarters building and operated by the Information Systems Flight. Force protection objectives and the physical security program at the 911 A W require a separate building for the base mailroom function due to the potential effects of terrorists activities that may occur through the base mail. Under the No Action Alternative, the current mailroom in the headquarters building would continue to be operated and the base would not be able to effectively meet security requirements.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 2003
Accession Number
ADA633054

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Air Force Personnel
  • Civil Engineering
  • Construction
  • Cultural Resources
  • Dielectric Gases
  • Engineers
  • Environment
  • Environmental Assessment
  • Environmental Protection
  • Force Protection
  • Hazardous Materials
  • International Airports
  • Materials
  • Natural Gas
  • United States
  • Volatile Organic Compounds

Readers

  • Aviation Safety and Air Traffic Management
  • Facility/Structural Engineering.
  • Military Training and Readiness Simulation