Environmental Assessment: Construct Dumpster Screen Near Sunflower Chapel at Grand Forks AFB, North Dakota
Abstract
This Final EA has been prepared in accordance with the National Environmental Policy Act, and assesses the potential environmental impacts of repairing electrical lines along Eielson Street on Grand Forks AFB, located in Grand Forks County, North Dakota. Resource areas analyzed in the EA include Air Quality; Noise, Wastes, Hazardous Materials, and Stored Fuels; Water Resources; Biological Resources Socioeconomic Resources; Cultural Resources; Land Use; Transportation Systems; Airspace/ Airfield Operations; Safety and Occupational Health Environmental Management; and Environmental Justice. In addition to the Proposed Action, the Utilization of an Alternate Dumpster and the No Action Alternative were analyzed in the EA. The EA also addresses the potential cumulative effects of the associated construction activities along with other concurrent actions at Grand Forks AFB and the surrounding area.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 16, 2003
- Accession Number
- ADA633996
Entities
People
- Heidi Durako
Organizations
- Grand Forks Air Force Base