Environmental Assessment: Construct Mass/Mobility Parking Lot at Grand Forks AFB, North Dakota

Abstract

This Final EA has been prepared in accordance with the National Environmental Policy Act, and assesses the potential environmental impacts of constructing a mass/mobility parking lot on Grand Forks AFB located in Grand Forks County, North Dakota. Resource areas analyzed in the EA include Air Quality;.Noise, Wastes, Hazardous Materials, and Stored Fuels; Water Resources; Biological Resources; Socioeconomic Resources; Cultural Resources; Land Use; Transportation Systems Airspace/ Airfield Operations; Safety and Occupation Health Environmental Management; and Environmental Justice. In addition to the Proposed Action, the Alternative Action and the No Action Alternative were analyzed in the EA. The EA also addresses the potential cumulative effects of the associated construction activities along with other concurrent actions at Grand Forks AFB and the surrounding area.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 13, 2004
Accession Number
ADA634058

Entities

People

  • Brad Schulte
  • Everett Crouse
  • Gary L. Johnson
  • Gary Raknerud
  • Heidi D Nelson
  • Heidi Durako
  • Kristen Rundquist
  • Larry Olderbak
  • Mark Hanson
  • Steve Braun

Organizations

  • Grand Forks Air Force Base

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Birds
  • Cells
  • Civil Engineering
  • Construction
  • Dielectric Gases
  • Environment
  • Environmental Health
  • Environmental Protection
  • Environmental Restoration And Remediation
  • Groundwater
  • Habitats
  • Medical Personnel
  • United States
  • Water Resources
  • Wildlife

Fields of Study

  • Environmental science

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.

Technology Areas

  • Space