Environmental Assessment for Construction of the Distributed Common Ground Station (DCGS) at Langley Air Force Base, Virginia
Abstract
The 1st Fighter Wing at Langley AFB proposes to construct a new 144,500-square-foot DCGS facility to support the completion of movement of personnel and equipment currently located in temporary vans. The DCGS will also strengthen operations to meet future mission near-real-time/real-time demands. Another alternative would involve demolishing Buildings 326, 329, 333, 337, and 339; vacating Building 338; and constructing an approximately 144,500-square-foot facility at the existing location on Sweeney Boulevard.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 2007
- Accession Number
- ADA634075
Entities
People
- Adam M. Hasen
- Claudia Laughlin
- David M. Dischner
- Howard B. Rock
- Irene Johnson
- Lorraine S. Gross
- Robert E. Van Tassel
- Tara Utsey