Environmental Assessment, Demolish/Re-construct Pelican Pier and Seawall, MacDill AFB, Florida

Abstract

Pursuant to the President's Council on Environmental Quality (CEQ) regulations, Title 40 Code of Federal Regulations (CFR) Parts 1500-1508, as they implement the requirements of the National Environment Policy Act (NEPA) of 1969,42 U.S.C. 4321, et seq., and the Air Force Instruction, Environmental Impact Analysis Process, as promulgated at 32 CFR Part 989, the U.S. Air Force conducted an assessment of the potential environmental consequences associated with implementation of the following proposed action: to demolish the existing pier and construct a new pier and seawall in its place. The environmental assessment considered all potential impacts of the proposed action and alternatives, both as solitary actions and in conjunction with other proposed activities. The Finding of No Significant Impact (FONSI) summarizes the results of the evaluation of the proposed action and alternatives. The discussion focuses on activities that have the potential to change both the natural and human environments. The Finding of No Practicable Alternative (FONP A) summarizes the options considered and why the proposed pier and seawall was designed and sited as proposed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 2003
Accession Number
ADA634243

Entities

People

  • Jason Kirkpatrick
  • Kelly L. Bishop
  • R. D. Lewis

Organizations

  • United States Department of the Air Force

Tags

Communities of Interest

  • Biomedical
  • C4I
  • Human Systems
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Birds
  • Environmental Protection
  • Habitats
  • Health Services
  • Medical Personnel
  • Nitrogen Oxides
  • Wildlife

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Facility/Structural Engineering.