Construction of a Plasma Resource Recovery System at Hurlburt Field, Florida. Final Environmental Assessment

Abstract

This Environmental Assessment (EA) analyzes and presents the potential environmental consequences associated with the construction and operation of a Plasma Resource Recovery System (PRRS) at Hurlburt Field, Florida. This EA has been prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, the Council on Environmental Quality (CEQ) regulations implementing NEPA (40 Code of Federal Regulations [CFR] 1500 1508), and Air Force regulations implementing NEPA procedures (32 CFR 989).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 07, 2008
Accession Number
ADA634363

Entities

People

  • Brad Boykin
  • Jason Koralewski
  • Jennifer Combs
  • Mike Nation
  • Pam Mccarty
  • Sherri L. Baker-littman
  • W. J. Mckee

Organizations

  • Leidos

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Force
  • Chemical Synthesis
  • Chemistry
  • Combustion
  • Construction
  • Dielectric Gases
  • Ecology
  • Energy Consumption
  • Environment
  • Environmental Health
  • Environmental Protection
  • Groundwater
  • Materials Laboratories
  • Materials Science
  • Nitrogen Oxides
  • Waste Disposal Facilities
  • Water Resources

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.