Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 1, Beale Air Force Base, California
Abstract
The purpose of the WINDO Implementation Plan at Beale AFB is to improve the facility planning process, capture the Wing Commander s vision of what infrastructure improvements are necessary to support the base s on-going mission, and link the Base General Plan to individual funding programs such as Military Construction (MILCON); Operations and Maintenance (O&M), Sustainment, Restoration, and Modernization for Contract (SRMC); Environmental Restoration Account (ERA); Defense Energy Systems Command (DESC); Anti-Terrorism/Force Protection (AT/FP); Quality of Life (QOL), Army & Air Force Exchange Service (AAFES),and other programs to provide a solid plan that both the base and Air Combat Command (ACC) agree upon and understand. The objective of this Environmental Assessment (EA) is to disclose and analyze potentially significant environmental impacts expected from implementation of Beale AFB s WINDO Implementation Plan and development projects and long-term mission-based actions which comprise the plan (the Proposed Action). A secondary objective of this EA is to determine the potential cumulative impacts from Beale AFB s mission base-wide.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 2005
- Accession Number
- ADA634581
Entities
People
- Aaron Anderson
- Angela Imamura
- Brian Hoppy
- Gina Von Damm Bogart
- Rachel Schneider
- Raul Reyes
- Ronald E. Lamb
- Sean Mccain
- Suanne Collinsworth