Environmental Assessment: Installation Development at Lackland Air Force Base, Texas
Abstract
The proposed action is to implement the requirements of the Base Realignment and Closure (BRAC) program related to Lackland AFB and perform other installation development activities based on the current Lackland AFB Capital Improvements Program (CIP) to upgrade, replace, or supplement facilities. Conversely, the Air Force could select to take no action (no action alternative). The alternative action (the potential development alternative) is to develop the facilities on Lackland AFB to the maximum capability of the installation and conduct technical and flying operations at maximum sustainable levels. The following biophysical resources were identified for study at Lackland AFB: noise land use, earth resources, water resources, hazardous materials and wastes, biological resources, utilities and infrastructure, socioeconomics, and air quality.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 2006
- Accession Number
- ADA634734
Entities
People
- Alysia Baumann
- Benjamin Elliott
- Bill Wuest
- Brandi Mulkey
- Carol Johnson
- Kent R. Wells
- Lesley Pedde
- Lisa P. Barron
- Robin Divine
- Victoria Wark
Organizations
- Leidos