Environmental Assessment for Extension of Wastewater Treatment Plant Effluent Force Main and Discharge to Wateree River for Shaw Air Force Base, South Carolina

Abstract

Shaw Air Force Base (AFB) proposes to construct a pump station and a force main for the discharge of treated wastewater effluent to the Wateree River. The project would include acquiring a permanent easement for the force main and pump station, installing approximately 24,000 feet of force main, and constructing a 2.6 million gallon per day (mgd) pump station. In addition to the proposed action, which routes the force main along U.S. Highway 76/378, this revised environmental assessment (EA) evaluated an alternative route through Gum Swamp, as well as the no-action alternative.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 2004
Accession Number
ADA636180

Entities

People

  • Claudia A. Druss
  • Claudia Laughlin
  • David Lingner
  • David M. Dischner
  • John Whelply
  • Kathleen Sherwood
  • Kimberly Freeman
  • Madeline Terry
  • Richard R. Mceldowney
  • Robert J. Henke

Organizations

  • Leidos

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Birds
  • Cells
  • Fish
  • Habitats
  • Medical Personnel
  • Wildlife

Readers

  • Environmental Engineering
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Riverine Ecology