Initial Operation of the Decade Quad in Lab Mode

Abstract

The Decade Quad NWE Simulator [ 1,2] will be in operation at the Arnold Engineering and Development Center in the fall of 1999. In its initial configuration, its four identical modules (Marx, transfer capacitor, coaxial water line and conical MITL) each terminate in plasma opening switch, large area bremsstrahlung (LAB) loads that combined will produce an x-ray dose of at least 16 krad (Si) over an area of at least 2250 cm*. A validation test of the first conical MITL and POS load driven by the Decade Module 2 at Maxwell Physics International has successfully produced an x-ray dose consistent with these performance requirements. The initial assembly and check out of the Decade Quad pulsed power subsystems has been completed and is reported herein. Initial x-ray tests are currently underway.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1999
Accession Number
ADA636345

Entities

People

  • C. Wellington
  • D. Kortbawi
  • Darren Price
  • K. Childers
  • K. Ware
  • P. Sincerny

Organizations

  • Defense Threat Reduction Agency

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Assembly
  • Capacitors
  • Electromagnetic Radiation
  • Engineering
  • Generators
  • Impedance
  • Peak Values
  • Plasma Opening Switches
  • Power
  • Pulsed Power
  • Radiation
  • Short Circuits
  • Simulators
  • Specifications
  • Test Facilities
  • Validation
  • X Rays

Fields of Study

  • Physics

Readers

  • Nuclear and Radiation Engineering.
  • Pulsed Power and Plasma Physics.
  • Software Engineering