Final Environmental Assessment for C-17 Beddown at Elmendorf Air Force Base, Alaska

Abstract

The purpose of the Proposed Action is to bring the USAF Alaska airlift capabilities to state-of-the-art standards and increase capacity through the addition of new C-17 aircraft. The Proposed Action involves replacing the 18 existing C-130 cargo aircraft fleet with 8 new C-17 aircraft, routine aircraft operations (both mission- and training-related), and the construction and use of support facilities on EAFB. The C-130 aircraft are scheduled to depart EAFB in 2006 and the C-17 aircraft are scheduled to arrive in 2007. New facilities would be constructed in a phased approach in an effort to minimize impacts to normal base operations. In addition to the Proposed Action, the no action alternative was analyzed, as required by the Council for Environmental Quality regulations implementing the National Environmental Policy Act (NEPA; 40 Code of Federal Regulations 1500-1508). Under the no action alternative, the USAF would not beddown the C-17 aircraft at EAFB.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 2004
Accession Number
ADA636509

Entities

People

  • Chris Love
  • Chris Menefee
  • Deborah Moore
  • Erin Cox
  • Farshad Farhang
  • Jane Gendron
  • Jennifer Hepner
  • Matt Flynn
  • Mwasi Mwamba
  • Tad Dean

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Airframes
  • Birds
  • Cells
  • Employment
  • Environmental Protection
  • Fish
  • Groundwater
  • Habitats
  • Health Services
  • Medical Personnel
  • Transport Aircraft
  • Warning Systems
  • Wildlife

Readers

  • Aerospace logistics and air mobility.
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.