Environmental Assessment Nellis Air Force Base Pipeline Project Nevada
Abstract
The purpose of the Ne1lis Air Force Base (AFB) Pipeline Project is to increase the refueling and fuel storage capacity of Nellis AFB by installing a larger liquid fuel pipeline to the West Operational Bulk Storage Area (WOBS) and the East Side Operations Storage (ESOS), and by constructing larger fuel storage tanks.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 2005
- Accession Number
- ADA637400
Entities
People
- Bob Turner
- Fred Turnier
- Geof Spaulding
- Holly Agustin
- Jay Piper
- Marjorie Eisert
- Robin Dewey
- Scott Hall
- Sean Collier
- Stephen Sands