Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Supplement Number 1. Comparison of Alternative Plans. Revision.

Abstract

This supplement report to the General Design Memorandum presents the results of further studies, including an up-to-date cost comparison, of three alternative solutions to the excessive shoaling problem in Charleston Harbor. The three primary alternatives compared are the Hydro Plan, the Price Inlet (Rt. B) Plan and the Energy Replacement Plan. The geographical features of these alternative plans are shown. Other plans investigated are reduced harbor maintenance, closing of Charleston Harbor and lump sum settlement.

Document Details

Document Type
Technical Report
Publication Date
May 07, 1975
Accession Number
ADA954663

Entities

Organizations

  • Charleston District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Continents
  • Geographic Regions
  • Maintenance
  • South Carolina

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering