Final Contamination Assessment Report, Site 4-6, Motor Pool Area. Version 3.1. 19

Abstract

This final report documents the phase I contamination survey of site 4-6, a vehicle maintenance area. A total of 36 borings, 1 soil grab sample, and 3 water samples yielded 169 samples. These samples were analyzed for volatile and semivolatile organics and metals. The following analytes were detected within or above their respective indicator ranges: C6H6, CHCL3, 11DCLE, ETC6H6, CH2CL2, TCLEE, MEC6H5, 111TCE, TRCLE, XYLEN, ALDRN, DBCP, CD, CR, CU, PB, ZN, AS, and HG. Because the phase I survey has defined the general extent of potential contamination, no phase II program is planned at this time. However, ground water monitoring and the drilling of a limited number of borings near the fuel storage tanks are recommended. The volume of potentially contaminated material presented is estimated at 180,000 cubic yards. Appendices include chemical names, phase I chemical data, and comments and responses.

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1988
Accession Number
ADA956505

Entities

Organizations

  • Ebasco Services

Tags

DTIC Thesaurus Topics

  • Containers
  • Contamination
  • Drilling
  • Groundwater
  • Indicators
  • Maintenance
  • Materials
  • Monitoring
  • Storage Tanks

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.
  • Materials Science and Engineering.