F-111D, DT and E Evaluation of Environmental Control, Airframe, Flight Control, and Secondary Power Subsystems. Appendix 2

Abstract

During the desert and tropic climatic laboratory test phases of the F-111D climatic test program, 11.5 hours of test time were accumulated during 11 test runs. Four test runs were selected as being the most representative of aircraft operation in regions with ambient temperatures varying from 70 to 125 degrees F and under varying relative humidities. All available data obtained on these test runs are presented in this document as computer printouts.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1973
Accession Number
ADB002374

Entities

People

  • Richard W. Olson

Organizations

  • Air Force Test Center

Tags

Communities of Interest

  • Advanced Electronics
  • Sensors
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircrafts
  • Automatic Frequency Control
  • Computers
  • Control Knobs
  • Control Sticks
  • Control Systems
  • Flight Instruments
  • Fuel Oils
  • Landing Gear
  • Plastic Explosives
  • Radar
  • Radar Altimeters
  • Recording Systems
  • Regulators
  • Swept Wings
  • Test And Evaluation
  • Wheel Wells

Fields of Study

  • Environmental science

Readers

  • Atmospheric Science/Meteorology
  • Business Analytics
  • Software Engineering