Advanced Metallic Air Vehicle Structure Program

Abstract

This report covers the manufacture of the wing carry through structure and the test fixture structure during the latter portion of Phase III, Fabrication. Included are design and analysis in support of manufacture and additional material testing, component testing and manufacturing research and development work funded as a part of the Credible Option added task. All detail parts and subassemblies for the wing carry through structure (WCTS) are complete. Final assembly of the WCTS is progressing on schedule toward a 31 January 1975 completion date. After final assembly of the WCTS the remaining strain gages will be installed and the dummy wing will be prefit prior to shipment to AFFDL/ FBT at WPAFB. Manufacture of all elements of the test fixture is substantially complete. The test fixture base is reassembled at WPAFB. The forward upper test fixture structure is at AFFDL/FBT at WPAFB being reassembled. The aft upper test fixture structure is being disassembled at Fort Worth in preparation for an early January 1975 delivery to WPAFB. The Advanced Metallic Air Vehicle Structure (AMAVS) Program is progressing on schedule toward a May 1975 start of testing in the Structural Test Facility at WPAFB. Fifteen months of static, fatigue and damage tolerance testing are planned.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1975
Accession Number
ADB007465

Entities

People

  • C. E. Hart
  • D. Clayton
  • E. F. Cox
  • E. J. Bilhartz
  • R. C. Bissell

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Air Platforms
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Aircrafts
  • Arc Welding
  • Engineers
  • Fabrication
  • Fasteners
  • Joints
  • Manufacturing
  • Manufacturing Engineering
  • Materials
  • Materials Testing
  • Measurement
  • Mechanics
  • Plastic Explosives
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Welds

Readers

  • Software Engineering