Malfunction Investigation of the XM935 Point Detonating Fuze
Abstract
This report documents the effort in the investigation of the premature of a 60 mm XM720 HE projectile with XM935 PD fuze on 4 September 1975 at Aberdeen Proving Ground during a safety certification test. The fuzes utilized in this test had 'short' pull wires, which were assumed to have been purged from the system. A previous incident involving fuzes with 'short' pull wires caused a premature function at Lone Star Army Ammunition Plant during a jolt test in June 1974. An in-depth study of mortar fuze safety was initiated to determine the cause of these incidents of premature fuzes. Presented are the design analysis, design approach, design concepts, and test results. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1977
- Accession Number
- ADB018406
Entities
People
- John F. Kostka
Organizations
- United States Army Armament Research, Development and Engineering Center