Information System Requirements for ICAM Sheet Metal Center. Volume III. System Environment.
Abstract
This Final Report describes results of the Computer-Based Information System (CBIS) project conducted for the Integrated Computer Aided Manufacturing (ICAM) Program. This project (Priority 3101) defined the requirements of a computer network that would integrate the functions of aerospace batch manufacturing. This Final Report is presented in four volumes. This part, Volume 3, is a System Environment Document, which describes the functions, components, and performance of a composite existing (ASIS) CBIS.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 10, 1982
- Accession Number
- ADB068013
Entities
People
- D. S. Appleton
- Kenneth E. Schoman Jr.
- R. R. Brown
- Robert M. Curtice
Organizations
- Arthur D. Little