ICAM (Integrated Computer Aided Manufacturing) Conceptual Design for Computer-Integrated Manufacturing. Volume 2, Part 4. Task B. Establishment of the Factory of the Future Conceptual Framework System Requirements Document (SRD).
Abstract
This document contains the Factory of the Future Conceptual Framework System Requirements. This document defines the Conceptual System Requirements for the enhancement of aerospace factory operations in the 1995 time frame. In particular, it defines requirements that will ultimately satisfy needs reflected in the Needs Analysis Document.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 29, 1984
- Accession Number
- ADB086101
Entities
Organizations
- Vought