Operation WIGWAM. Project 4.2. Weapons Assembly.
Abstract
Project 4.2 was requested to provide and assemble a warhead and firing system which would give a yield equivalent to 30 kt of TNT and be detonated at 2000 ft below the ocean's surface. This report tells how this was accomplished and brought to a successful conclusion on May 14, 1955, at 1300 PDT.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1980
- Accession Number
- ADB951739
Entities
Organizations
- General Electric