Development Test III of Quick Look II AN/ALQ-133.
Abstract
The QUICK LOOK II system met the critical issues/criteria except for the following: technical performance of the interim processor, reliability, manuals and spare parts were found to be deficiencies. Shortcomings were noted in the technical performance areas of system sensitivity, desensitization, fix accuracy, signal security and vulnerability, availability, maintainability, pod carrier, AN/ALM-153 instrumentation, BITE system performance, safety, and human factors. Despite the deficiencies and shortcomings noted, the nature of the discrepancies and the overall performance of the system merits its continued correction and evaluation. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1978
- Accession Number
- ADC014768
Entities
People
- Carleton W. Nellis