The Advanced Scout Helicopter (ASH) Estimating,

Abstract

Cost estimates: You could see from my discussion of the History of the ASH Aircraft there have been many, many estimates the ones shown here are those just before and after contract award. The estimates in 1980 were based upon a little simpler aircraft then wound up in the RFP. As you can see the Oct 80 estimate which was made using the draft RFP came very close to the final program cost when the contract was awarded. It must also be remembered that the R/D contract is a fixed price contract and therefore the cost exposurer to the government is limited.

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1982
Accession Number
ADP001240

Entities

People

  • Howard M. Gilby

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Aircrafts
  • Contracts
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Department Of Defense
  • Fixed Price Contracts
  • Governments
  • Helicopters
  • Virginia

Readers

  • Aerospace Engineering
  • Regression Analysis.
  • Technical Research and Report Writing.