The Handling and Performance Trials Needed to Clear an Aircraft to Act as a Receiver during Air-to-Air Refueling,
Abstract
A brief description is given of the AAR equipment and techniques presently used in the RAF. The handling and performance tests needed to clear a new receiver type are described, together wth some of the results obtained when large transport aircraft are used in the receiver role.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1984
- Accession Number
- ADP004106
Entities
People
- J. Bradley