V & V of MuSES 6.0 Status Report
Abstract
MuSES 6.0 was released late in 2001. TARDEC has undertaken a formal verification and validation procedure as described in the Army Modeling and Simulation Office Pamphlet 5-11 and as described in the Defense Modeling and Simulation Offices Guidelines on the subject. The full report is expected to be finished in the Fall of 2002. This paper will give examples of the latest results of the tell environment Cubi tests and additional verification and validation tests. In addition the paper will discuss some of the lessons learned on the V&V of engineering level models.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 2002
- Accession Number
- ADP023083
Entities
People
- Al Curran
- Alice Garhardt
- David Less
- John S. Curlee
- Peter Rynes
- Teresa Gonda
Organizations
- Tank-automotive and Armaments Command