Integ Mission Equip for Vert Lift Systems Adv Tech
Abstract
This Project develops and demonstrates a mission systems architecture to support Future Vertical Lift (FVL) through utilization of a reconfigurable and flexible tiered architectural approach. Work in this Project is fully coordinated with PE 0602148A (Future Vertical Lift Advanced Technology Development). The cited work is consistent with the Under Secretary of Defense for Research and Engineering Science and Technology focus areas and the Army Modernization Strategy. All FY20 adjustments align program financial structure to Army Modernization Priorities in support of the National Defense Strategy. Work in this effort is performed by the United States Army Futures Command (AFC).
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2021
- Source ID
- AJ9_0603465A_3_2040_PB_2021
Related Documents
- Root: Future Vertical Lift Advanced Technology
- Child Accomplishment: Integrated Mission Equipment for Vertical Lift Systems