APACHE BLOCK III
Abstract
Project D17, Apache Block III (AB3) funding is for the non-recurring engineering (NRE), development, and testing work associated with the planned remanufacture and new build of 690 Apache aircraft in the Block III configuration (deliveries to begin in Oct 2011). The AB3 program consists of two Major Defense Acquisition Programs (MDAP), AB3A Remanufacture and AB3B New Build. The AB3 is the best value sustainment plan for the Apache fleet that overcomes capability gaps and satisfies user requirements. The AB3 will add significant combat capability while addressing obsolescence issues to ensure the aircraft remains a realistic combat multiplier through 2040. The AB3 will address current system shortfalls by integrating: Unmanned Aircraft System (UAS) Level IV Control Capability, Improved Situational Awareness, an Upgraded Communications Suite, Improved Drive and Propulsion Systems, Improved Targeting Capability, Increased Computer Processing Capability and Speed, Improved Navigation Systems, and Improved Diagnostics and Maintainability. FY12 funding totals do not include any previously requested funding for current FY12 Overseas Contingency Operations (OCO) requirements, and no FY12 OCO funds have been previously requested in the RDTE Project D17. FY11 funding totals did not include any previously requested funding for current FY11 Overseas Contingency Operations (OCO) requirements, and no FY11 OCO funds have been previously requested in the RDTE Project D17. FY10 funding totals did not include any previously requested funding for current FY10 Overseas Contingency Operations (OCO) requirements, and no FY10 OCO funds have been previously requested in the RDTE Project D17.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2012
- Source ID
- D17_0203744A_7_2040_PB_2012
Related Documents
- Root: Aircraft Modifications/Product Improvement Programs
- Child Accomplishment: Major Contracts
- Child Accomplishment: Other Major Contracts
- Child Accomplishment: Program Support Activities
- Child Accomplishment: Government Participation, Operational Assessments
- Child Accomplishment: Management Services
- Child Accomplishment: Small Business Innovative Research/Small Business Technology Transfer Adjustment
- Child Cost Item: 6bb47bb8bbf4a09145579d98f62bf515
- Child Cost Item: c4b1355e7cd8a81a600cc98dd05bb34a
- Child Cost Item: cca2e395c2474636f8734ec418671b08
- Child Cost Item: bac17858b3df5c1717c48f4af75e00f5
- Child Cost Item: 2305945b097be528cc91d7a9fd996c2f
- Child Cost Item: 42adb1fcbad04ba2d855e1481dd5d0a4