Grnd-Based Opnl Surv Sys -Exped (GBOSS-E)
Abstract
Ground-Based Operational Surveillance System (Expeditionary) (G-BOSS(E)) will replace the interim Persistent Surveillance System-Ground (PSS-G) Increment 1 towers with improved persistent surveillance capabilities and will provide network integration and better mobility utilizing modular configurations. G-BOSS(E) will replace obsolete, Quick Reaction Capability (QRC) surveillance and force protections systems utilizing modular configurations: Medium variant (mid sensor height) for small to medium size base camps and Heavy variant (high level sensor height) for large contingency base camps. G-BOSS(E) will operate in a stand-alone mode or as part of an integrated network utilizing government owned software, be easily operated and maintained, and be rugged enough to support employment in expeditionary operations worldwide. FY21 is the last year of RDT&E funding for this program.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2022
- Source ID
- EQ3_0605033A_5_2040_PB_2022
Related Documents
- Root: Ground-Based Operational Surveillance System - Expeditionary (GBOSS-E)
- Child Accomplishment: GBOSS-E Design and Build
- Child Cost Item: d870ed7906d875274fea229b772deb58
- Child Cost Item: 53128ad6084c1bd09a8fced8e427d22b
- Child Cost Item: aaf4742776f019bb6de19667f9543334
- Child Cost Item: 96f7d73bc7482204cbf123773f30865e
- Child Cost Item: 3ad903a6c9f7b34ed8be2f8355935b3a
- Child Cost Item: 12654cb15da48c1bb7e9ff391d834c53
- Child Cost Item: 04434ea2268f286a6df565ffdc16dab5
- Child Cost Item: fccb11cf381c02368bb4103992ce019d
- Child Cost Item: bd139615b4bf18f22e5ebc8d311015c5
- Child Cost Item: b58f5d2108372d70eb3e06b13a4d97c2
- Child Cost Item: 3347a78574fe6a3318a2512d7552027a
- Child Cost Item: 5b15c77454d3852b7dff8e59034e3f01
- Child Cost Item: 5fe43d42d2c6fd3f1d1b3e38cc3505fc
- Child Cost Item: 70466e07648696490b32f960a770b64c
- Child Cost Item: ee3d21f9b2b4e0eb09f9cbec66862505
- Child Cost Item: 9a8a4edda44dd8ceb68c5a21c1e0f4c7