Expeditionary Army Command Post
Abstract
This funding line is directly aligned to the Army Network Modernization Strategy Line of Effort (LOE) #4 Command Post. Efforts are aligned to support the Network-Cross Functional Team capability set approach to achieve the network modernization strategy. Program will implement capabilities in a two increment approach. Increment 1 will implement prototype capabilities as identified in signed Directed Requirement and Increment 2 will execute the requirements identified in Capability Development Document (CDD) due for review/approval in 2QFY20. These capabilities will enable the Army to employ command posts across the operational spectrum, from early entry to major combat operations that will resolve current command post issues with set up and tear down, survivability, mobility, suitability and footprint. The Command Post Integrated Infrastructure (CPI2) program addresses the requirements for more mobile, scalable, interoperable, and agile command posts. Currently fielded command posts are deemed too large and take too long to setup and teardown making them vulnerable to near peer detection and targeting technologies. By integrating mission command warfighting functions on to formation appropriate vehicle platforms, a dispersed command post construct will enable the battle staff to blend in with the overall maneuver formation while giving the commander the ability to synchronize the close fight on the move. This dispersed mobile command post consists of Mission Command Platforms (MCPs) and Command Post Support Vehicles (CPSVs). The MCP is a formation appropriate vehicle that provides digital workstations for all mission command warfighting functions. The CPSV is the hub of the dispersed command post; it hosts mission command servers, radios, local area network components and a secure wireless capability. Specific to CORPS/DIV, CPI2 will provide a Mobile Command Group (MCG) consisting of formation appropriate platforms that supports Corps/Div Commanders/Staff with high priority functions while on the move. FY 2021 initiates Inc 2 portion of the program to address design engineering and prototype development for formation-appropriate MCPs, MCGs, and CPSVs and includes design changes to platform shelters as required based on results of experimentation. Funds will also support integration and testing for Increment 1 with 2 BCT's and a Division Main to obtain user feedback to drive future requirements. Includes funding for engineering changes, test and training, CPI2 program management.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2021
- Source ID
- ER9_0604818A_5_2040_PB_2021
Related Documents
- Root: Army Tactical Command & Control Hardware & Software
- Child Accomplishment: Program Office Management
- Child Accomplishment: Product Development
- Child Accomplishment: Systems Test and Evaluation
- Child Accomplishment: Support Costs
- Child Accomplishment: FY 2020 SBIR/STTR Transfer
- Child Cost Item: 8be3aa4b03d7a31e2e1f8779769d1963
- Child Cost Item: fe5d14ed823887d9dcae24f999bfa965
- Child Cost Item: 892a68b37287fcc7ce2858c6792dc357
- Child Cost Item: 76fe037b5c7aab213eed89fd8f635c33
- Child Cost Item: 9def08d32e6fa1a41e7ecfdf49683ff4
- Child Cost Item: 47cc2a2fe073ba266daa9b8f8452f13c
- Child Cost Item: 23d4c2067f87805f9dd886d058bc042a
- Child Cost Item: 09c4fa5b0ccbfb137eb44d03c5fc34b1
- Child Cost Item: 738654362548b5e3398608578629f7c4
- Child Cost Item: 40209aa115a67aea9e678ba43de8df5f
- Child Cost Item: 57d8839edbedfa92628dd53c8ee3c97b
- Child Cost Item: dc90defacbb156a702a9d82f4984be02
- Child Cost Item: 13db100a7763ab961fb0eab21b033818
- Child Cost Item: b713baa9ef67203505152c0e962a2ead
- Child Cost Item: ce4cfdb12258b52f862ec3eefe61d7ad
- Child Cost Item: d06eaa72a3fe0608efffd2d171545ba6
- Child Cost Item: efbeea1105213cb78a4e0117c841dcdd
- Child Cost Item: 03eea1db7f62f1217b6ec59cb799f3e5
- Child Cost Item: 53d695c84088457b7f68f9521b2d2fa4
- Child Cost Item: d5f1d10681c5aad80b4feac52af3ba3f
- Child Cost Item: 66b0fdbb47a70216b661f84866450d58
- Child Cost Item: 7d29d9a4d821dbcbd689ae3030914d0d