Apache Product Improvement Program
Abstract
The funding associated with the Apache Product Improvement Program funding line, previously known as Apache Block III, funded the non-recurring engineering (NRE), development, and testing work associated with the planned remanufacture and new build Apache aircraft in the AH-64E configuration (deliveries began in Oct 2011). The AH-64E program consists of two Major Defense Acquisition Programs (MDAP), AH-64E Remanufacture and AH-64E New Build. This project addresses reliability challenges and provides increased combat capability to the aircraft. Upgrades include: Unmanned Aircraft System (UAS) Level III-IV Control, Improved Situational Awareness, Upgraded Communications Suite, Improved Drive and Propulsion Systems, Improved Targeting Capability, Increased Computer Processing Capability and Speed, Improved Navigation Systems, Improved Diagnostics and Maintainability, and Joint Air to Ground Missile (JAGM) integration. Upgrades are integrated as incremental block modifications. The program addresses operational shortfalls identified during real-world combat missions and meets Longbow Apache Capability Production Document (CPD) requirements for modernization.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2020
- Source ID
- ES2_0607135A_7_2040_PB_2020
Related Documents
- Root: Apache Product Improvement Program
- Child Accomplishment: Product Development
- Child Accomplishment: Test and Evaluation
- Child Accomplishment: Management Services
- Child Accomplishment: FY2019 SBIR / STTR Transfer
- Child Cost Item: 9a3f828929bd0232a02f607544343f31
- Child Cost Item: ccc9bb70f76e69c89a2193e8d7090bf2
- Child Cost Item: 0c4b3baa3494183e5a64b7ed4361a979
- Child Cost Item: c81022329e389c7c5d814393c9ccc2c9
- Child Cost Item: 0a727044f7f38b01e789c7fac3d8bda4
- Child Cost Item: 19ffb46414a9866eaf198ede0adaa4f3
- Child Cost Item: f7fac3482c07ad5b27db6d1928db184c