Chinook Product Improvement Program

Abstract

The CH-47 Chinook is the Army's only heavy lift helicopter and is an essential element of the current Army Aviation master plan. This program funds improvements to the CH-47F System that include: T55-GA-714A engine control and component upgrades to increase power to support emerging 6K/95 requirements, continued development and testing of the Advanced Chinook Rotor Blades (ACRB) which will provide increased lift in high/hot conditions and reduce Operation and Support (O&S) costs. Production of the ACRB will begin in Fiscal Year (FY) 2018. Funding supports the transition from individual Engineering Change Proposals (ECPs) into a CH-47F Block II Engineering/Manufacturing Design (EMD) effort with Milestone B planned for third quarter of FY 2017. Funding also initiates advanced flight control and drive train component improvements to improve aircraft performance. Development of requirements specifications, studies and risk reduction prototyping are also part of this effort.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2017
Source ID
ES4_0607137A_7_2040_PB_2017

Tags

Fields of Study

  • Engineering

Readers

  • Aerospace Engineering
  • Military Science and Technology Research and Modernization.
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.

Related Documents